Project Dashboard

Cambridge Bay Material Extraction and Quarrying (148349)
Proposal Status: Closed w/o Conformity Determination
Project Overview
Type of application: New
Proponent name: Mr. Glen Molloy
Company: Nunavut Excavating 2007 INC.
Schedule:
Start Date: 2017-09-04
End Date: 2017-10-13
Operation Type: Seasonal
Project Description:
Nunavut Excavating is proposing to estabish own quarry adjasant to the existing Cambridge Bay Community Grave Pit, to Extract approximatley 1000 cu.m of granular materials for using in various locations in Cambridge Bay.
Personnel:
Persons: 3
Days: 45
Project Map
List of all project geometries:
ID Geometry Location Name
2771 polygon To establish own quarry adjasant to existing used community quarry
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Municipal
Settlement Area
Project Land Use and Authorizations
Project Land Use
Pits and quarries
Licensing Agencies
INAC:
NIRB:
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Excavator 1 3.92m x 2.7m x 2.95m Extract Granular Materials
Freight Liner 1 6.15m x 3.81m x 2.72m Moving Grnular Materials
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 1 1000 Liters Fueling Equipment
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0
Waste and Impacts
Environmental Impacts
No environmental impact is anticipated, as granular will be extracted and hauled to the construction site. No water or special process is scheduled on site.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Overburden (organic soil, waste material, tailings) 10 top soil if need to be removed will be saved and reused to cover exposed soil. resue to cover exposed tendera
Category: Application related document - Generic Review Letter
Recieved: 2017-05-17
Originator: Alana Vigna
Public Registry ID: 12680
Document Size: 154.78 Kb