Project Dashboard

Bling Recce (148588)
Proposal Status: Closed w/o Conformity Determination
Project Overview
Type of application: New
Proponent name: Mr. Corey Segboer
Company: Aurora Geosciences Ltd.
Schedule:
Start Date: 2017-05-17
End Date: 2019-05-17
Operation Type: Seasonal
Project Description:
The proposed project would include a 2 to 4 man geological and geophysical exploration crew over the next 2 years. Surveys included are prospecting, mapping, sampling, geophysical surveys and staking. The crew would mobilize to the various areas via Twin Otter on floats/skis or helicopter. Once at site the crew would establish a small, 2 tent camp and operate at a location. Any and all materials brought to site would be removed upon demobilization. Small quantities of gasoline would be used to run the generator for power in camp, propane would be used for cooking on a small camp stove. Sewage and grey water would be buried onsite while all other waste would be removed from site. The bulk of the program is expected to run between March 1st and September 30th of each year with some short term work in other seasons as well.
Personnel:
Persons: 2
Days: 21
Project Map
List of all project geometries:
ID Geometry Location Name
2826 polygon Bling Recce Area
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Inuit Owned Surface Lands
Settlement Area
Project Land Use and Authorizations
Project Land Use
Mineral Exploration
Licensing Agencies
KitIA:
NWB:
Other Licensing Requirements
No data found.
Material Use
Equipment
Type Quantity Size Use
Generator 1 2kw Power for camp
Twin Otter 1 Float/Ski plane Transportation to and from area
Helicopter 1 B3 Transportation to and from area
Tent 2 pop up tents Sleeping
Camp stove 1 camp stove Cooking
Geophysical survey gear 1 various Conduct ground geophysics surveys
Fuel Use
Type Container(s) Capacity UOM Use
Gasoline 1 25 Liters generator
Propane 1 4 Gallons cooking
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
No records found.
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
0 bucket Lake
Waste and Impacts
Environmental Impacts
No predicted environmental impacts. The crew will operate on foot. The small camps will have minimal impact, any and all materials and refuse will be removed from each site as the crew departs.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Greywater 20L Sump Sump
Sewage (human waste) 30L buried onsite buried onsite
Combustible wastes 2 garbage bags dump in Yellowknife removal from site
Non-Combustible wastes 1 garbage bag Yellowknife dump removal from site
Category: Application form attachment - Project description
Recieved: 2017-05-17
Originator: Corey Segboer
Public Registry ID: 12691
Document Size: 197.03 Kb
Category: Application related document - Generic Review Letter
Recieved: 2017-05-19
Originator: Alana Vigna
Public Registry ID: 12699
Document Size: 153.42 Kb