CAM-E (Keith Bay) Site Remediation - Water Licence Amendment (148627)
Proposal Status: Conformity Determination Issued
Project Overview
Type of application: New
Proponent name: Mr. David Rochette
Company: AANDC (CSPNU), Govt of Canada
Schedule:
Start Date: 2016-04-01
End Date: 2020-03-31
Operation Type: Seasonal
Project Description:
THIS IS AN AMENDMENT TO NPC FILE NO: 148190: REASON FOR AMENDMENT: REQUEST TO NWB TO INCREASE QUANTITY OF WATER USE PER DAY FROM 14 m3 TO 40 m3 CAM-E (Keith Bay) is located at approximate coordinates: 68o 17’ 16” N; 88o 07’ 10” W. It is about 75 km east of Kugaaruk, 280 km west of Hall Beach, Nunavut. CAM-E was constructed in 1957 as an Intermediate Distant Early Warning (DEW) Line site. The station was taken out of service in 1963 and in 1965, responsibility for the site was assumed by the Department of Indian Affairs and Northern Development (DIAND). DIAND plans to clean up the site starting from 2016 and finishing about 2020. The initial Nunavut Planning Commission (NPC) Conformity Check was done for the entire CAM-E Remediation project. NPC determined that the project proposal submitted was outside the area of an applicable regional land use plan (ref: NPC File # 148190 CAM-E (Keith Bay) Remediation Project dated January 27, 2016). This modification is triggered by the proposed change to the daily water usage at the site. The approved water usage with the existing Water Licence is 14 m3/day. The project team feels that moisture conditioning may be required during site construction which may require more water usage. To this end, The CAM-E project team has requested Nunavut Water Board to increase water usage from 14 to 40 m3/day.
Personnel:
Persons: 35
Days: 420
Project Map
List of all project geometries:
ID Geometry Location Name
2959 point
Planning Regions:
Qikiqtani
Affected Areas and Land Types
Settlement Area
Project Land Use and Authorizations
Project Land Use
Site Cleanup/Remediation
Licensing Agencies
INAC:
NIRB:
NWB:
Other Licensing Requirements
Class A Water License
Class A Land Use Permit
Material Use
Equipment
Type Quantity Size Use
Backholes 3 > minimum Weight 10 tonnes Site Remediation - demolition, construction, grading, regrading etc. (precise details to be provided by successful contractor)
Tracked Tractors 2 > minimum weight 10 tonnes Site Remediation - demolition, construction, grading, regrading etc. (precise details to be provided by successful contractor)
Others - Various 10 > minimum weight 10 tonnes Various - Site Remediation - demolition, construction, grading, regrading etc. (precise details to be provided by successful contractor)
Fuel Use
Type Container(s) Capacity UOM Use
Diesel 10 10000 Liters run equipment, vehicles and camp heating
Gasoline 10 205 Liters run vehicles and ATVS
Hazardous Material and Chemical Use
Type Container(s) Capacity UOM Use
None 0 0 Liters N/A
Water Consumption
Daily Amount (m3) Retrieval Method Retrieval Location
40 To be provided by successful contractor To be provided by successful contractor
Waste and Impacts
Environmental Impacts
This application is very similar to the original application. This new application is necessitated because the contractor feels that during the short period of constructing the Tier II facility, water use per day may be up to 40 m3/day instead of the 14 m3/day; hence NWB has been requested to increase daily water use to 40 m3/day. The consultant has adviced that the existing Environmental Screening Report is still valid with this proposed change as the chnage will not generate any additional wastes that will impact the environment. The predicted environmental impacts of this project and the proposed mitigations are contained in the attached Environmental Screening Report. Once the mitigations are applied, the residual effects of the project on local economy, traditional land use, human health an archaeological and heritage resources are predicted to be none or negligible in magnitude.
Waste Management
Waste Type Quantity Generated Treatement Method Disposal Method
Hazardous waste 260 cubic meter Tier II landfill facility partial abatement before landfilling
Hazardous 25 cubic meters Non-Hazardous Waste Landfilling of Double bagged Asbestos Asbestos - Double bag and place in NHW Landfill
Hazardous waste 16 units Disposal Of-site of 16 units batteries Batteries- Package and Dispose of-site
Other 1700 cubic m NHW Landfilling Cut barrels, debris, cylinders, demo wastes into smaller piesces
Other 3600 cubic m Dispose in Tier II Landfill Excavate and haul to Tier
Other 100 cubic m Dispose of in NHW Landfill Excavate and collect
Other 1200 cubic m Dispose of NHW Landfill Excavate and Haul
Other 1900 cubic m On-site Landfarm on-site treatment
Other 3,160 cu m Remediate in place or excavate and relocate In Accordance with AANDC Protocol
Sewage (human waste) 650 cu m Bionest plant operated by the contractor N/A
Greywater 315 cu m Dispose with sewage N/A
Combustible wastes TBD On-site incineration in an enclosed container N/A
Non-Combustible wastes TBD Disposal in on-site NHW Landfill N/A
Overburden (organic soil, waste material, tailings) TBD If non-hazardous dispose in NHWL, otherwise dispose in Tier II facility or ship off-site N/A
Other TBD Collect and dispose with similar waste types N/A